Foot traffic
When and where do people walk — and do they stop at businesses?
145 manual counts (37 h) · 414 automated intervals (414 h)
“Busy sidewalks are not the same as customers”
District 11 Youth Research Team
Block-by-block research in San Francisco District 11
The District 11 Youth Research Team conducts youth-led, block-level research on small-business conditions and street environments in San Francisco District 11. The project combines field observations with short merchant interviews to identify recurring local challenges and better understand how conditions differ across commercial corridors.

Reported by the research team.
Every calculated total, with its definition, is on the Findings page
Four threads of the study. Each one opens its evidence on the map and in the findings.
When and where do people walk — and do they stop at businesses?
145 manual counts (37 h) · 414 automated intervals (414 h)
“Busy sidewalks are not the same as customers”
Does changing a parking rule change how the curb is actually used?
5 monitored spaces · 59 observation windows
“A shorter posted limit did not, by itself, free up parking”
What do merchants and people on the street say — and where do their views differ?
88 businesses gave substantive feedback (33 in depth) · 80 pedestrian interviews
“Access is more than parking — and merchants and pedestrians see it differently”
How clean are the sidewalks, and does a cleanup last?
67 street observations
“After a cleanup, more pedestrians — for a while”
What changed our thinking
Implementing a solution is not the same as solving the problem
The team first measured success by getting a practical change approved. A shorter parking limit was put in place, but customer access did not clearly improve; a cleanup helped for a short time, but litter returned. The research moved from rules to behavior, and from one-time fixes to maintenance.
Read the findingWhat the team has done, observed and proposed — and what is still under study. Each entry says how it is known. The stages are numbered in the order of the project; a date is shown only where it is documented.
Completed
The team visited businesses block by block along Mission Street and identified the problems merchants raised most often.
Team account
Completed
Researchers recorded storefronts and street conditions on each block face as a starting point for later comparisons.
Team account
Completed
Merchants' concerns about parking and customer access led the team to study the curb and develop proposals.
Team account
Observation
Through District 11, the team discussed curb parking with City agencies and learned that the corridor already has a number of loading zones. Asked about their effect, merchants said they had noticed little difference in parking or customer access.
Team account
Completed
To go beyond impressions, five ultrasonic parking monitors measured how full the monitored spaces were, how long vehicles stayed and how often spaces turned over.
Team account
Completed
Two camera-based counting systems and two pedestrian counters measured foot traffic as the research widened to commercial activity along the corridor; with the parking monitors, the equipment recorded more than 900 device-hours.
Team account
Completed
A cleanliness intervention on part of M1 was compared with a similar block face left unchanged, with observations before and after.
Team account
Observation
Later checks looked at whether litter came back and where public bins are available along the busiest frontages.
Team account
Completed
The team returned to merchants it had interviewed to ask how customers and staff arrive and which street changes they would support.
Team account
Completed
The team presented what merchants and the field work showed, and discussed practical next steps for access, parking and street conditions through District 11 and City channels.
Team account
Proposal
Proposals for parking, walking, cycling and transit are still being evaluated with the evidence collected so far.
Team account
Mission Street is the first active corridor. Geneva Avenue and Ocean Avenue are planned.
Level 1 · Corridors
Commercial streets in District 11. Mission Street is active; the others are planned.
Level 2 · Study zones
Mission Street has three study zones: M1 (Daly City line → Geneva Ave), M2 (Geneva Ave → Ocean Ave) and M3 (Ocean Ave → Highway 280).
Level 3 · Block faces
Inside each zone, the east side (E) and west side (W) of Mission Street are divided into block-face study areas.
Reading a block ID
M2Study zone-ESide (E or W)3Block number
M2-E3 is block face 3 on the east side of study zone M2.
Every figure on this site comes with its sample size or observation coverage, and links back to the blocks it describes.